Hi lads, if you could help me out guide me with my approach on some artex ceilings I'm doing at the mo. Done 3 last week got 3 more to do this week. Used the zombie mix for the 1st coat, flattened straight away with speed skim then 2cd coat straight away. They hung for an eternity, they been taking about 4.30 mins to set. I'm clearly doing something very wrong. I wba the ceilings, which I've now read is a waste of time as the pattern is your key + there has been no heating in the house. Loved the zombie 1st coat. Any tips please