roryston
Well-Known Member
Done this a number of times, mainly over ceailings in peoples houses that are to tight to over board them..
I always put a coat over it all, float it with a sponge float than leave it to dry, after that pva and skim it with 2 coats.
I got a hallway, stairs and landing to do soon, has anyone got any other ideas of how to cover it quicker? Or am i pretty much bang on with the way I do it?
I always put a coat over it all, float it with a sponge float than leave it to dry, after that pva and skim it with 2 coats.
I got a hallway, stairs and landing to do soon, has anyone got any other ideas of how to cover it quicker? Or am i pretty much bang on with the way I do it?