CeeVee
Well-Known Member
Had to skim over this today. Polish workers 'floated' this.
One set took 5 hours. It looks like they've something in board finish now too just like multi...all greasy and horrible. Like learning the trade from scratch.
It held and held...then the laying down coat flash set while the scratch was still wet through. Two of us in a room each both did exactly the same.
And they always want to pay peanuts.
I'm too old for this sh1te.
I don't know how long I can carry on like this.
One set took 5 hours. It looks like they've something in board finish now too just like multi...all greasy and horrible. Like learning the trade from scratch.
It held and held...then the laying down coat flash set while the scratch was still wet through. Two of us in a room each both did exactly the same.
And they always want to pay peanuts.
I'm too old for this sh1te.
I don't know how long I can carry on like this.