Keith job I'm on there's a stop bead running horizontally and vertically of each corner of the window, plus others between these beads, it's part brick lower half where the drip of the block meets the brick there's already a 15-30mm step then the full depth of the drip bead is instructed to be shown over this so the edge of the bead will be at 40mm The block work is absolutely shocking I'm sure you know yourself if you don't line up beads perfect with mono it goes brittle cracks and there's not a lot you can do especially on a next day scrape You can't run a horizontal bead at 30mm, stops not just bell casts and get them to sit still if you dab them with krend and in the current climate no one will pay for hpx to stick beads, I don't trust OCR I've seen beads fail just with a slight tap it goes dustier than mono, nails are out obviously We've used 10mm beads because the feature between the brick and the block is supposed to be flush with the stops this is how bad the blockwork is it's 25mm plus out in places, no dubbing out rates and we were on the job a week before they were threatening with dropping the scaffold and the firm I'm on for incurring charges, do you really think anyone gives a fart lately anyway about if it falls off or not :RpS_lol: