Site monkeys/Skimmers vs "proper plasterers"

Red Dead is so impressive. Nothing comes close for the detail and the laugh you have playing Rockstar games. Brilliant. I’ll complete it over Xmas
What online like. Can't cope with games like cod as its like a free for all. Be nice having a death match with 3 or 4 players where you need to be sneaky rather then shooting f**k out everything
 
Red Dead is so impressive. Nothing comes close for the detail and the laugh you have playing Rockstar games. Brilliant. I’ll complete it over Xmas
Far cry 5 is good with graphics to! Got red dead the other day that’s good but a bit long winded some times! 4K tv with the pspro sorted for crimbo.
 
Because I’m a f**k**g idiot. Put my foot in a bucket too. Brian is pissing himself at me. Says it serves me right for being an abnoxious little s**t lol
1543926822884.png
 
Ok prick, 170 a day!!! b*ll***s, 2 spreads and a labourer that’s what you are, f**k off you disrespectful little c**t

Love it mate, it was a highly questionable 170m with getting the measure through some pretty big doors and windows but 170m none the less I got paid for that day, it was a one off I've never repeated it and average between 80-90 a day most weeks.
 
I'm a disrespectful little c**t for pointing out that some younger site skimmers who get 90 percent of their work threw only skimming on site are far quicker than the older proper plasterer types at getting the metres on, f**k me it's a touchy world
 
I'm a disrespectful little c**t for pointing out that some younger site skimmers who get 90 percent of their work threw only skimming on site are far quicker than the older proper plasterer types at getting the metres on, f**k me it's a touchy world
I just don’t believe you could finish 170 mtr on your own
 
You can always argue the fine lines between speed and quality, bet half you lads and women glass your walls up to death and think your giving a brilliant finish, drawing every bit of moisture out of the plaster in the process and giving the painter a nightmare having to sand your work up to get a half decent key
I just don’t believe you could finish 170 mtr on your own
It is possible cottage effect
 
I don't understand why lads are getting the hump about a 170m day, it was a one off and it turned into a battle between me and another lad....dont get mad that some of have the fitness levels to do it
 
I don't understand why lads are getting the hump about a 170m day, it was a one off and it turned into a battle between me and another lad....dont get mad that some of have the fitness levels to do it
Well I take my hat off to you. 170sqm in a
7-5 day equates to 1sqm completed every
3 1/2 minutes. That's two coats and, I'm guessing, three passes of the trowel over a SQM every 210 seconds not allowing for time to mix up or go for a piss.
Super impressive.
I definitely couldn't have come anywhere near that even in my prime.
 
170 metres in a ten hour day is 17 metres an hour or just under 6 boards an hour, if you think this is impossible it says more about you than it does about me

Like I said, it wasn't a full 170m lay on, we got the measure threw doors and windows but 170m was what I got for that day
 
Top