Hi all....Have started a job just before the hot weather kicked in.
Have got the front done as it wasn't to hot then but I have 100m2 spilt into 2 panels to finish.
Rend aid has been on for about 3 weeks at least, meshed and beaded.
Top coat is going to be Weber OCR hand applied at around 15mm average finish (brick work was terrible)with ashlar stone effect markings (not proper Ashlar).
Question is.... Who would lay in this weather bearing in mind The Sun is shining directly on this elevation from Sun rise til at least 2/3 in the afternoon.
The scaffold doesn't really shield it apart from bottom deck and 1st lift.
Top lift is directly in Sun along with 2nd lift.
I wouldn't hesitate if it was shaded but, Yeeezus ive been there doing some bits and boobs and it is hot while the suns out!
The whole reason Im doing this job is because the old stuff was cracked and the client wont be happy if the new stuff does to, neither will I, neither will my wallet!
Thanks in advance.
Have got the front done as it wasn't to hot then but I have 100m2 spilt into 2 panels to finish.
Rend aid has been on for about 3 weeks at least, meshed and beaded.
Top coat is going to be Weber OCR hand applied at around 15mm average finish (brick work was terrible)with ashlar stone effect markings (not proper Ashlar).
Question is.... Who would lay in this weather bearing in mind The Sun is shining directly on this elevation from Sun rise til at least 2/3 in the afternoon.
The scaffold doesn't really shield it apart from bottom deck and 1st lift.
Top lift is directly in Sun along with 2nd lift.
I wouldn't hesitate if it was shaded but, Yeeezus ive been there doing some bits and boobs and it is hot while the suns out!
The whole reason Im doing this job is because the old stuff was cracked and the client wont be happy if the new stuff does to, neither will I, neither will my wallet!
Thanks in advance.