I don't price like that, got stung in the past, I work for insurance firms on day rate but they give a steady income of work.
Say you have a stair case to plaster going to take 3 days Inc ceilings, no boarding
Same staircase wants Plastering still takes 3 days but you overboard ceilings (extra 2 hours) and can charge an extra £120.00 for the extra work and rightly so.
A block price is for the job being complete (however long it takes) as long as the work doesn't change.
Done the day rate thing to death, price for what your doing not how long your there.
I'm Plastering a staircase next week, will take 2 days, charged £700, does that mean im charging £320 per day labour..... Or does it just mean im charging £700 to skim a staircase
Or should I be charging £360.00 by pinning a day rate on it, because no fooking way will be charging a little as that.
Same with wooden beading, which I take out and bond up usually inbetween trowels usually charge an extra £30-£40, I'm still there for the same amount of time but there having more work done.
Say you have a stair case to plaster going to take 3 days Inc ceilings, no boarding
Same staircase wants Plastering still takes 3 days but you overboard ceilings (extra 2 hours) and can charge an extra £120.00 for the extra work and rightly so.
A block price is for the job being complete (however long it takes) as long as the work doesn't change.
Done the day rate thing to death, price for what your doing not how long your there.
I'm Plastering a staircase next week, will take 2 days, charged £700, does that mean im charging £320 per day labour..... Or does it just mean im charging £700 to skim a staircase
Or should I be charging £360.00 by pinning a day rate on it, because no fooking way will be charging a little as that.
Same with wooden beading, which I take out and bond up usually inbetween trowels usually charge an extra £30-£40, I'm still there for the same amount of time but there having more work done.