I'm like that with my biggest customer. Have to be or I'll be the last to get paid because he thinks I'm more approachable than say, the hire company.
I'm currently on stop over €90.
Yup €90. (Different €90 to the shower job)
He came up and bought tiles then sat down and told me he was a bit short, then paid me wrong and later than he said. He wasn't f**k**g short when he took his daughter shopping for tiles was he?
Then he said must be a problem with the bank and showed me a screenshot of the money sent.
Told him to resolve problem and I'll bang tiles on right away.
View attachment 42784