User___removed
Well-Known Member
I have a large elevation of mono to do (white).on the drawings it is showing a band running through the middle.
If I was going to do this with sand&cement I would measure where the band is going to be,and scratch the area when topcoating and when dry fix stop beads ready.
Would this be the best way to mono over the mono.
The band is black!!
Cheers
If I was going to do this with sand&cement I would measure where the band is going to be,and scratch the area when topcoating and when dry fix stop beads ready.
Would this be the best way to mono over the mono.
The band is black!!
Cheers