plasterjfe
Private Member
Monorex. Anyone on same day with a 2pass spray and mesh on 15mm bead ? 7n block work ?
Hmn. One of our lads is getting all sprayed by 10 and starting scraping at 3 one pass tho.
Same day with monorex means a long day. Sprayed yesterday afternoon ,done by 3;30pm over 16degrees and very sunny and wasn't to bad this morning at 8;00am.
yes but its always cold in Middlesbrough steve.
:huh: can he get me some of those magic beans aswell.
Lucky cos job he is on don't need a mesh so he is just spraying a pass at full thick and its ready for 3 so probably all done for 5/ 5.30
So I take it everyone is on next day still. Looks like afternoon sprays then.