Same day with monorex means a long day. Sprayed yesterday afternoon ,done by 3;30pm over 16degrees and very sunny and wasn't to bad this morning at 8;00am.
Same day with monorex means a long day. Sprayed yesterday afternoon ,done by 3;30pm over 16degrees and very sunny and wasn't to bad this morning at 8;00am.
Not with monorex.
Obviously you need the material stiffer but if we run 20m of hose at 26 bar it will be fine. We usually run 18 19 ish bar with 20m hose for 2passes and mesh.
2passes is always best and it will hang longer etc plus reduce the risk of cracking g from fast dry but its good gear so shouldn't be a prob.
Snag I have is we always 2pass but I need to fit 6or7 days into 5 this week so same day would be nice