i like the way you measure stuff :RpS_thumbup:
Sorry 10 metre by 2.4 metre
Thanks mate. Wasnt going to use base coat as its straight on block work just going to mesh stress areas. How much a bag is it?Anklets I'm near cheshire mate an use buildbase in traff park they have **** loads in mate I would get 28 bags to be on safe side depending on background are you using a base coat?if so will need less krend ft
Krend covers 0.8 m per bag at 17mm scraps back to 15.
Never a metre per bag in a million yrs
Plus mesh and beadsThink Nantwich is the closest to me. So I need 30 bags? Its going to cost about £300 its only one wall
Is this job for yourself or a paying customer ?
Have you used krend mate ?
Just thinking weber may be easier for you to use , never used krend myself ,but used weber a bit
Think Nantwich is the closest to me. So I need 30 bags? Its going to cost about £300 its only one wall
Ive helped with other plasterers scratch back but never ruled of or anything. Looks easier then render though
Do you have to mix k rend with a paddle mixer then leave it 5 and mix again? Do you have to pva block work?
Yeah you need to.... say you go with a 6 bag mix. It will prob take 10 mins to get it mixed. Then leave for 5 then mix again for 5. Its better to use this way but still anti productive process all the same pffff
Cheers mate. Can I just mix in a gorilla bucket? Do I need to pva?