S a plastering
Private Member
got a small area about 6mtrs to base on to boards would it be ok to mesh first pass then top off with another top coat on the same day or is it best leaving the first coat to dry thanks
Just make sure the boards are set up right to spec. Split the time up between coats as long as possible.got a small area about 6mtrs to base on to boards would it be ok to mesh first pass then top off with another top coat on the same day or is it best leaving the first coat to dry thanks
got a small area about 6mtrs to base on to boards would it be ok to mesh first pass then top off with another top coat on the same day or is it best leaving the first coat to dry thanks
cheers palIt'll be fine Ste. In these temperatures it'll go off fast.
thanks mateYes mate, that the way I like to do it if I can