Currently converting an previous space and have come across a problem hopefully someone can help with.
Two walls are thicker on the bottom half than the top, giving approx. a 20-50mm lip throughout the middle. I've attached some pictures to show it better. Walls are back to the blockwork.
Anyone got any suggestions to what the best / easiest way to get this all level top to bottom with plasterboarding? Batten the top half to bring it out level to the bottom, then board?