Vincey
Private Member
Got a few bags to trial of this bonding and thought its worth a share to TPF.
I used a couple of trial bags last year with different set times but it looks like this 60 minute set and ready to skim might be getting the go ahead for release.To be honest it was ready to skim in 45 minutes but I left it for the 60 minutes.i had a little diner room to skim got there and as usual on the blessed domestic jobs there was 5 chases there that I hadn't quoted for and had a small area of loose that needed hacking and float i banged this on and blobbed my finish straight over everything and still finished near enough on time,absolute god send.Fair enough we all know a bit of cement in normal bonding would speed it up but this was real nice gear to use.
I used a couple of trial bags last year with different set times but it looks like this 60 minute set and ready to skim might be getting the go ahead for release.To be honest it was ready to skim in 45 minutes but I left it for the 60 minutes.i had a little diner room to skim got there and as usual on the blessed domestic jobs there was 5 chases there that I hadn't quoted for and had a small area of loose that needed hacking and float i banged this on and blobbed my finish straight over everything and still finished near enough on time,absolute god send.Fair enough we all know a bit of cement in normal bonding would speed it up but this was real nice gear to use.