zomex
Member
Hello all,
Next job on the list is this floor for a small downstairs toilet.
Since the photo I've added another DPM.
I've got around 100mm of concrete to hit my level.
Wondering if anyone has any ideas of tips to get this level right. I don't own a laser level.
I was thinking of screwing a batton to the wall but that would compromise the DPM. The I thought of drawing a line of chalk but that wouldn't be reliable as I've got nothing to stick the DPM to so it's tight.
How about doing a few concrete blobs at the right level, waiting for them to go off so I've got a reference? Assuming it wouldn't make the slab too weak.
Cheers
Next job on the list is this floor for a small downstairs toilet.
Since the photo I've added another DPM.
I've got around 100mm of concrete to hit my level.
Wondering if anyone has any ideas of tips to get this level right. I don't own a laser level.
I was thinking of screwing a batton to the wall but that would compromise the DPM. The I thought of drawing a line of chalk but that wouldn't be reliable as I've got nothing to stick the DPM to so it's tight.
How about doing a few concrete blobs at the right level, waiting for them to go off so I've got a reference? Assuming it wouldn't make the slab too weak.
Cheers