skimmin2day
Active Member
£200 materilas
9 days with over boarding £2000.
overboard and skim 1 ceiling eachday =3days
skim eachroom x 3 = 3 days
3 days to do hsl and studwork to recesses.
These wont be long killer days either.
9 days with over boarding £2000.
overboard and skim 1 ceiling eachday =3days
skim eachroom x 3 = 3 days
3 days to do hsl and studwork to recesses.
These wont be long killer days either.