Hi there, I've got a small mono job to do this week(35/40 m2). I was going to do it on an afternoon and scrape it the following morning, however I was unsure if that would be ok considering the temperature drop during the night? It's been quite cold up here during the last few nights (roughly 3-5 degrees)
thanks for any help
thanks for any help