Jace
Well-Known Member
alright guys got a screed job on tomorow but its an all week jobby so the screedis goin to be joined in a few places im goin to put brick ties in to join the screeds but i was wondering if there was anything that i should apply to the joint aswell before i start the next screed i.e. sbr or pva or something, being a domestic plasterer ive only ever had to do an extension or conservatory (single areas) never a entire level of a house? the jobs easy enough just wanted some know how on the joints
taa muchly lads
taa muchly lads