I priced up a 2 bed flat with to storage rooms. and bonding and skim in the kitchen and bathroom. all ceilings and a massive hallway for your typical flat. i went in cheap at 2400. looking at about a weeks work. they had quote shortly after which they took which was 2000 pound for the plastering and to do the tiling in the kitchen and bathroom. and maybe paint the kitchen aswell. am i just dear on the price or am i bonkers. because this seems to be happening alot.