currymunster
Active Member
Do the odd screed job here and there and usually get away with but after watching one of the pros on you tube I'd like to learn some of that finer detail - If you can help??
At the mo doing a 4 to 1 sharp sand mix - in mixer till wet enough to ball in hand.
Go round edge doing box screed and then central ones and fill in.
When filling in I'd like to be able to get a nice finish. At mo i poly float and steel off after.
when screeding it rips and leaves gaps no matter what I do.
Would and aluminium straight edge solve that as opposed to the standard 1800mm level I'm using.
Also is it the mix - maybe a secret ingredient??
Oh and yes I am a plasterer - just don't do a lot of screeding.
Thanks Guys
James
At the mo doing a 4 to 1 sharp sand mix - in mixer till wet enough to ball in hand.
Go round edge doing box screed and then central ones and fill in.
When filling in I'd like to be able to get a nice finish. At mo i poly float and steel off after.
when screeding it rips and leaves gaps no matter what I do.
Would and aluminium straight edge solve that as opposed to the standard 1800mm level I'm using.
Also is it the mix - maybe a secret ingredient??
Oh and yes I am a plasterer - just don't do a lot of screeding.
Thanks Guys
James