as merlin says spunk, read the spec some systems have different requirments for fixing numbers and in some cases a pull out test will be needed (dodgy substrates) some systems also request more up the corners and at system ends.
parex is stick only as is dryvit but if the building goes above ground floor first floor, they may well spec secondry fixings therafter