Crazy quote contrasts

I don't think your taking in all of the parameters
1 you may quote two or three jobs , loosing half a day
2 collection of materials
3 disposal of waste


And finally


4 plumb and level stud work and ceilings
5 ceilings joints mid joists

So its got to be close to a grand inc materials
 
Top