Ceresit Render query

Members online

No members online now.

BTCL

New Member
I have a semi-detected property which had a bad cement render job to the side and rear. When planning to add a side extension it was decided that the property would be re-rendered - side and rear inc. the new extension.

My builder advised that as removing the existing render would cause too much damage to the brickwork, Ceresit would be rendered over the top of the existing render and it would be done in three stages;

1. any prep work would be completed first and the side and rear of the house would be rendered by a sub-contractor, less the area where the side extension was to be built and the window reveals as the windows were being replaced.
2. once the side extension was built, that would be rendered by the builder.
3. any making good the rest of the house would be completed by the sub-contractor.

Now the job has been finished, I am shocked at how bad it looks! Iv attached some pictures to show the quality of the work completed. The builder tells me that any colour difference will fade in time and blend as one. Other areas can be made good.

Any advice before my meeting with the builder and sub-contractor?

Thanks
 

Attachments

  • R1.jpg
    R1.jpg
    161.1 KB · Views: 131
  • R2.jpg
    R2.jpg
    355.2 KB · Views: 136
  • R3.jpg
    R3.jpg
    605.6 KB · Views: 131
  • R4.jpg
    R4.jpg
    268.2 KB · Views: 137
  • R5.jpg
    R5.jpg
    300.5 KB · Views: 134
  • R6.jpg
    R6.jpg
    359.7 KB · Views: 133
  • R7.jpg
    R7.jpg
    195.4 KB · Views: 127
  • R8.jpg
    R8.jpg
    455 KB · Views: 131
  • R9.jpg
    R9.jpg
    411.9 KB · Views: 136
Top