Got a gable to do this morning using a 15m + 5m on the Ritmo L. Material is Weber Pral.m in Chalk. Primed and got the consistency how we wanted it and started pumping it through the just pre wetted pipes with loads of Fairy in. 2m from the end and it blocked good and proper. Put the purge pipe up and wacked it with a hammer and after 20 minutes got the pipe freed and washed out.
Then came another problem, the materials in the r&s was blocked. tripped out the machine so we gave it a good kick, mashed up and cleaned the machine out and buggered off home as it was to late now for a same day scrape.
So what I am thinking is while we was trying to clean out the pipe would it have been a good idea if the Labradoodle turned the Ritmo motor on every couple of minutes or so to keep the R&S wet with with fresh stuff?
Having another go in the morning if everyone turns up being 'forgot about changing of the clocks' get out clause.
Then came another problem, the materials in the r&s was blocked. tripped out the machine so we gave it a good kick, mashed up and cleaned the machine out and buggered off home as it was to late now for a same day scrape.
So what I am thinking is while we was trying to clean out the pipe would it have been a good idea if the Labradoodle turned the Ritmo motor on every couple of minutes or so to keep the R&S wet with with fresh stuff?
Having another go in the morning if everyone turns up being 'forgot about changing of the clocks' get out clause.