Hi, I don't do screeding myself, this is a part of a bigger job, according to specification "laser level check on floor screeding". Floors in the basement will have to be done twice, first time to level the floor (75-100mm screed) and second time after fitting insulation/membranes (65mm screed). This is basement conversion. You can PM me or call me 07789222478.
Thanks
Dan