I am fairly new to the game but have managed to get my skimming to a decent standard but i am after a bit of advice.
How long do you leave the first coat before starting the second?
How long should it take to skim celing and all walls say 4 x 3 Metre room (cos i aint quick enough on me own) :RpS_blushing:
I normally do ceilings first (for some strange reason i find this easier than walls ) then first coat 2 walls then second coat back at the beggining then do the other two. Is this the correct sequence?
I find around switches/sockets a mare - any tips?
Sorry about all the questions but just finished my house and am completely knackered so want to know why its takes me so long.zzzz
I am fairly new to the game but have managed to get my skimming to a decent standard but i am after a bit of advice.
How long do you leave the first coat before starting the second?
How long should it take to skim celing and all walls say 4 x 3 Metre room (cos i aint quick enough on me own) :RpS_blushing:
I normally do ceilings first (for some strange reason i find this easier than walls ) then first coat 2 walls then second coat back at the beggining then do the other two. Is this the correct sequence?
I find around switches/sockets a mare - any tips?
Sorry about all the questions but just finished my house and am completely knackered so want to know why its takes me so long.zzzz