hi dry wallers
doin a tape n joint job at the mo and i have joint fillered it all today. its a 3 coat system by the way per the bg spec of 1 joint filler coat followed by 2 joint cement coats.
tomorrow i want to joint cement it out but wonder if the first coat will dry in time for me to get the 2 coats done without risk of shrinkage. its only about 150m sq so can imagine once a coat goes on we will be twiddling thumbs.
also this time of year how long will it be before its dry enough to sand off and paint.
sorry lads but never done such a small job with jointing before and dont normally paint either, usually each coat we do on 3 different days as the areas are big
doin a tape n joint job at the mo and i have joint fillered it all today. its a 3 coat system by the way per the bg spec of 1 joint filler coat followed by 2 joint cement coats.
tomorrow i want to joint cement it out but wonder if the first coat will dry in time for me to get the 2 coats done without risk of shrinkage. its only about 150m sq so can imagine once a coat goes on we will be twiddling thumbs.
also this time of year how long will it be before its dry enough to sand off and paint.
sorry lads but never done such a small job with jointing before and dont normally paint either, usually each coat we do on 3 different days as the areas are big