Laid on a sand/cement external elevation today. A foot above bellcast never pulled in enough to float up 100% so we floated it as well as we could and all we could do is return in the morning float it up again and sponge it off. Small problem though is a foot down from the soffit the wall will be fairly well set so I'm wondering how to bring bit back so the whole wall can be done in 1 act. I could sprinkle with water and spin the float on it to bring the 'fat' up again but I'd be worried about shrinkage cracking down the road in a few months. How do you boys get over this problem? Cheers