I put them in photo bucket but failed to learn how to transfer them on here,just down loaded them from the iPad , then saw they were upside down..Photo bucket John???
These were down loaded direct fro iPad,not sure why the ended upside down..John, before you post the pics, use photobucket to rotate the pics to the correct orientation
Lovely job, everything was done perfectly for us, plaster boarding was nicely fitted, ceilings were 48m squared but we had a nice platform scaffold, so three easy buckets for first coat and one and a half for second, used speed skim and spat, so damn easy..
As opposed to having the half wits ahead of us, this is a good firm, great team the have, very fussy, great carpenters ,electricians, I have done stuff on and off for twenty years for them, two lofts to do for them next week..Doesnt half make a deference having good trades ahead of you, I do a lot of work a kitchen company and everything is spot on from plumbing, sparks and joiners, a pleasure to do work with
The carpenters fitted stop bead where the board mets the old timber beams, leaves nice clean line, its going to be an office..
A lot of sites just leave us the wet work , they board for the electricians to first fix etc and to keep,themselves busy.Dont plasterers do there own tacking ( that would be screwing now ) anymore ?
It's one of those things, used the iPad this week to take pics as I may set up a website soon, more or less sorted.just need photos(right way up) and some other stuff.Nice pictures john ,can i get of my head now :RpS_crying: :RpS_thumbup:
Take my hat of to you ,hope the new web site goes well mateIt's one of those things, used the iPad this week to take pics as I may set up a website soon, more or less sorted.just need photos(right way up) and some other stuff.
Photos of studio 1 skimming of boardwork