PlastererNW
New Member
Hi Everyone,
I'm new to the forum and a full-time plasterer, normally work on general internal jobs. But recently been asked to do some rendering jobs... New Field! As far as I know am I right in thinking its 4 parts sand, 1 part cement with Waterproofer? Is it then one layer, leave for abit. 2nd Layer, leave for abit. Then float off. Job done.
Ive been asked to do a few small patch up jobs, can somebody advise on the approach one job is about 1mx1m where there dryer extractor used to be. Thanks.
I'm new to the forum and a full-time plasterer, normally work on general internal jobs. But recently been asked to do some rendering jobs... New Field! As far as I know am I right in thinking its 4 parts sand, 1 part cement with Waterproofer? Is it then one layer, leave for abit. 2nd Layer, leave for abit. Then float off. Job done.
Ive been asked to do a few small patch up jobs, can somebody advise on the approach one job is about 1mx1m where there dryer extractor used to be. Thanks.