Hi All
Machine has broken on a Friday evening so I'm after a machine for hire or machine with man to pump 80 bags on Sunday and 500 bags Monday 500m2 at 12mm 500m2 at 6mm, I have experienced lads on site to help pump.
Three phase available on site need around 60-80lm of hose for job. It is an Ardex waterbase Ardex screed so a G5, Mtec 300 or equivalent is fine.
Job in south of England
Thanks
Ben