nickelarse
Well-Known Member
when using sand and cement, if were doing the plinths weve always just beaded the whole lot and floated the plinths at the same time as the wall.
a guy the other day i was speaking to was adamant that he would scratch and float the plinths first, then cut a line above them and sit the bell bead on it. reckons its a lot easier and saves having your head on the floor floating a plinth.
anyone do this?
a guy the other day i was speaking to was adamant that he would scratch and float the plinths first, then cut a line above them and sit the bell bead on it. reckons its a lot easier and saves having your head on the floor floating a plinth.
anyone do this?