messy job

Members online

Hi
can anyone help,ive just spent £1300 on having my hall,stairs and landing plastered,but have holes in the stair skirting,the plasterer has said i need to cork it,because decorators do that before they decorate,but i thought having it plastered would leave clear clean (filled ) skirting.can someone advise? (their are actually quite alot of holes in corners,above skirting,and troll lines on most of the walls )
 
Hi
can anyone help,ive just spent £1300 on having my hall,stairs and landing plastered,but have holes in the stair skirting,the plasterer has said i need to cork it,because decorators do that before they decorate,but i thought having it plastered would leave clear clean (filled ) skirting.can someone advise? (their are actually quite alot of holes in corners,above skirting,and troll lines on most of the walls )

I can't see a single thing wrong with the job.
 
B61702BF-F619-4105-AFE5-256029DBF60D.gif

Nope can’t see a thing!
 
Was it as messy as this one? Holes everywhere. Got to be home by 3. Late start. And a f**k**g Sunday? Brand spanking new kitchen to be painted NOT tiled. Led strip lights beaming off plaster.

Can you imagine a site monkey unleashed in there? Write it off in a heart beat

A2F681B9-2932-409E-B052-2FFB0C432969.jpeg
386D410C-9EE9-41BC-BA06-4786B48B9F3E.jpeg
FBC82CFE-25B5-4CB6-A6C6-9081855432F6.jpeg
 
Was it as messy as this one? Holes everywhere. Got to be home by 3. Late start. And a f**k**g Sunday? Brand spanking new kitchen to be painted NOT tiled. Led strip lights beaming off plaster.

Can you imagine a site monkey unleashed in there? Write it off in a heart beat

View attachment 29081View attachment 29082View attachment 29083
Had same today . But did ceiling . Left it spot less. Proved I can be clean when i want and need to be . Just glad it's not all time
 
Had same today . But did ceiling . Left it spot less. Proved I can be clean when i want and need to be . Just glad it's not all time

That's my last Sunday for 2018 thank god.
Xmas completions up to date (y)
Ground floor skimmed on 3 bed house in 2 hits.
Whole plot skimmed in 6 hits.
 

Attachments

  • IMG_20181125_081223.jpg
    IMG_20181125_081223.jpg
    3.8 MB · Views: 268
  • IMG_20181125_081212.jpg
    IMG_20181125_081212.jpg
    4.2 MB · Views: 267
  • IMG_20181125_081159_HHT.jpg
    IMG_20181125_081159_HHT.jpg
    2.7 MB · Views: 256
  • IMG_20181125_151310.jpg
    IMG_20181125_151310.jpg
    4.7 MB · Views: 254
  • IMG_20181125_150917_HHT.jpg
    IMG_20181125_150917_HHT.jpg
    3.2 MB · Views: 298
  • IMG_20181125_151000.jpg
    IMG_20181125_151000.jpg
    4.1 MB · Views: 239
  • IMG_20181125_151125_HHT.jpg
    IMG_20181125_151125_HHT.jpg
    3.3 MB · Views: 258
Well here's my Sunday I'm genuinely feel like telling him I've had enough of them I'm always the daft c**t who loses out.. Pick the materials up.. End up working late whilst he earns thousands and I get a mere share..
 

Attachments

  • VID_20181125_164527.mp4
    22.3 MB · Views: 224
Why oh why not just finish at ceiling line!

Couple more handboards for such a better job imo!
Listen if it was down to me I'd rip the lot off and start again and then skim it all... He specifically says not to do it.. I don't no how many times I tell him trying to dab a board on the membrane to match the existing which is ruffled out is a nightmare at the best of times.
He charges silly money for it too if its for a landlord he says do it half way but in someone else's house he says do the opposite I bang my head against the wall.
 
Top