LOL.. We would have finished much earlier ,but we spent an age clearing up the mess the barrow boy made outside:RpS_mad:Dont trust this man he told me we would be finished by 12pm and we didnt finish till 6 minspast and he is fat.![]()
2m cube, fibres+ I worked for a re***d
Is that a stick your using to tamp it with Mark , never seen it tapped flat with the end off some 2x1, and don't try tellin us it was for your datum !
LOL.. We would have finished much earlier ,but we spent an age clearing up the mess the barrow boy made outside:RpS_mad:
I know, tell me about it. I was going to go charging in there with a wacker plate and a ride on power float, but he was having none of it. Reckon I was going to flatten all his copper pipes or something!!! . So a stick it was. :RpS_bored:
In all my years I've never had anyone spoil me with ready mixed screed, you lucky boy Mark.
Having said that I never order it for myself either, but that's coz I'm tight.[/QUOTE
Anything over 2m2 its the only way Andy on domestics its quicker cleaner and far better quality than anything you would put through a mixer.
Dont think ide want to cart one of them about just to do one extension floor.I've never had any trouble getting a decent consistent mix from my Winget 150FT, when I was young and fit I used to mix and lay 80sq m a day on my own.