Knauf SFS Speeds Construction At Prestige Development

Status
Not open for further replies.
The final phase of Crest Nicholson’s established development of new homes in Portishead, Bristol Ninety4 on the Estuary was built using SFS infill panels from @knauf for speed and quality of construction.

http://www.plasterersnews.com/knauf-sfs-speeds-construction-at-prestige-development/

KD1503CP-Knauf-Crest-Nicholson-Portishead-SFS-1-1024x683.jpg
 

Dansouthcoast84

Private Member
I dont get how they say no need for scaff. So cutting costs. Surely to insulate and render the bloody thing you do. Or can you render inside then turn it around!
 

Runswithscissors

Private Member
I dont get how they say no need for scaff. So cutting costs. Surely to insulate and render the bloody thing you do. Or can you render inside then turn it around!

Think that they are referring to the installation of the SFS.... the insulation and render has to be done from the outside - so must have scaffold or cherry pickers or something to install that.
 

Runswithscissors

Private Member
Hmmmmm - have you just patented the render from the inside and turn the wall around point.....? Render in the inside, let it dry and turn the walling around later..... Love it....

Not sure it is actually possible though..... Get Beddy on it!
 
Status
Not open for further replies.
Top