How much sand and cement per sq

Alsplastering96

New Member
Hi Guys,

Would really appreciate your help, I have a good size build of 200m2 approx and they have asked for render and set.

How many sq meters does a tonne do? And how far does cement go? Haven't done it in a while and cannot for the life of me remember. Is it the same as outside render 35m2?

Bearing in mind scratch coat obviously first before coming back and ruling.

TIA
 
Last edited:
Hi Guys,

Would really appreciate your help, I have a good size build of 200m2 approx and they have asked for render and set.

How many sq meters does a tonne do? And how far does cement go? Haven't done it in a while and cannot for the life of me remember. Is it the same as outside render 35m2?

Bearing in mind scratch coat obviously first before coming back and ruling.

TIA
That will depend on the state of the block work . Thickness of the casings if the back boxes are sunk deep enough ect .
 
Hi Guys,

Would really appreciate your help, I have a good size build of 200m2 approx and they have asked for render and set.

How many sq meters does a tonne do? And how far does cement go? Haven't done it in a while and cannot for the life of me remember. Is it the same as outside render 35m2?

Bearing in mind scratch coat obviously first before coming back and ruling.

TIA
7 bags of cement to a tonne bag at 5 - 1
Just get 5 tonne to start with and see how you get on, you'll know when you're coming to the end how much you need to finish it
 
7 bags of cement to a tonne bag at 5 - 1
Just get 5 tonne to start with and see how you get on, you'll know when you're coming to the end how much you need to finish it

the baged sand is only 3 quarters of a ton.
if the floating is 12mm thick , 6 ton of sand will cover 210 m2. you need a little extra to allow for waste.
 
the baged sand is only 3 quarters of a ton.
if the floating is 12mm thick , 6 ton of sand will cover 210 m2. you need a little extra to allow for waste.
I thought it was 850kg , just saying
 
Thanks for your help guys, appreciate it
That will depend on the state of the block work . Thickness of the casings if the back boxes are sunk deep enough ect .

Block work is very good but haven't had any comments on the back boxes, as long as they're not too deep should be okay.
 
Would I also need waterproof in scratch and top or just scratch?

Obviously leave a few days before plastering but could anyone also tell me do I PVA? And will the plaster go off very fast as there are some decent size walls
 
why would you need to scratch coat first mate.

you can skim following day

30/35m for bulk bag depending on thickness
water proof wont do any damage except skim take ages to set.
 
why would you need to scratch coat first mate.

you can skim following day

30/35m for bulk bag depending on thickness
water proof wont do any damage except skim take ages to set.

I've seen it done both ways, scratch then two coats and ruled and I've also seen three coats?? And ruled.

When you say ages what we talking? Normal cold board setting times or like one set a day because of hanging?
 
Hi Guys,

Would really appreciate your help, I have a good size build of 200m2 approx and they have asked for render and set.

How many sq meters does a tonne do? And how far does cement go? Haven't done it in a while and cannot for the life of me remember. Is it the same as outside render 35m2?

Bearing in mind scratch coat obviously first before coming back and ruling.

TIA

40m2 a ton 7 25kg bags of cement. Don't use waterproof
 
in this weather with water proof your talking long long gauges mate.

Long gauges for plaster or the s&c sorry? As s&c I put on till 12 and wait and float.

Would you suggest just two coats of s&c then?
If I were to leave it for a week or 2 and come back will it not go off quick?
 
Why are all my valid comments getting taken off this thread? I've made 3 and all gone? It's a f**k**g wind up the guy hasnt a clue so he should be called out on it b4 charging some poor t**t to f**k there home up..just saying

Who are you to tell me I don't know what I'm talking about????????? Literally this is supposed to be a fuc*ing plasterers forum and so I ask a few questions and I'm accused of gonna f**k up someone's house? Sounds like only 6 people on here are allowed to fuc*ing do anything because they're obviously the tits???
 
Who are you to tell me I don't know what I'm talking about????????? Literally this is supposed to be a fuc*ing plasterers forum and so I ask a few questions and I'm accused of gonna f**k up someone's house? Sounds like only 6 people on here are allowed to fuc*ing do anything because they're obviously the tits???
Don't you worry about GOGGLEBUM mate.

Momma got a surprise for him.
 
giphy (6).gif
 
Who are you to tell me I don't know what I'm talking about????????? Literally this is supposed to be a fuc*ing plasterers forum and so I ask a few questions and I'm accused of gonna f**k up someone's house? Sounds like only 6 people on here are allowed to fuc*ing do anything because they're obviously the tits???
Look back at your posts u knob rash..u havnt a clue...u ain't a scooby door pal..do urself and ur customers a favour and quit plastering and go work at tescos or sumat...your welcome
 
Look back at your posts u knob rash..u havnt a clue...u ain't a scooby door pal..do urself and ur customers a favour and quit plastering and go work at tescos or sumat...your welcome

I haven't a clue because I said about putting waterproof in it? Which makes the gear workable lol and said that I've seen it done both ways... Which I have. You're a mug mate, bet youre a site monkey that boasts to his friends that he's a specialist.. special maybe
 