Hi all!! First post on here so dont go to hard ;-)
Ive finished a few ewi jobs and theyve turnt out prety good im my opinion. Only bits im a bit annoyed about, on 1 job I split the gabel into 4 sections as it was quite a big gable. 3 sections turnt out fine, on the last which was the biggest where ive droped down from the scaffold to floor level where ive gone along then droped down to carry on, once floated up theres flat smooth patches along where the planks would be.
Obviously this is where its drying to quick before floatin up and its just going flat. is there any easyer solution or does it mean I need more hands on the job?
Many thanks
Aaron
Ive finished a few ewi jobs and theyve turnt out prety good im my opinion. Only bits im a bit annoyed about, on 1 job I split the gabel into 4 sections as it was quite a big gable. 3 sections turnt out fine, on the last which was the biggest where ive droped down from the scaffold to floor level where ive gone along then droped down to carry on, once floated up theres flat smooth patches along where the planks would be.
Obviously this is where its drying to quick before floatin up and its just going flat. is there any easyer solution or does it mean I need more hands on the job?
Many thanks
Aaron