bloody stuff

Members online

Status
Not open for further replies.

4x4

Active Member
I got to a mate's house that I'm doing right through at 9 this morning.
I stuck pva on the hall ceiling about 7 last night then rolled second coat on first thing today. It's now almost 1 and it's still wet and slimy. Bah!
Sod it for today, I'm giving up. This was going to be the last mix downstairs. Just 2 bedrooms upstairs to do now.
 
I got to a mate's house that I'm doing right through at 9 this morning.
I stuck pva on the hall ceiling about 7 last night then rolled second coat on first thing today. It's now almost 1 and it's still wet and slimy. Bah!
Sod it for today, I'm giving up. This was going to be the last mix downstairs. Just 2 bedrooms upstairs to do now.
Should have just skimming it this morning and not bothered with applying more and waiting for it to go tacky

Sent from my SM-N910F using Tapatalk
 
Yeah, it needed sealing (ha..ha..)
Looks like first coat did a good job anyway. At last it's ready to skim next time.
 
Status
Not open for further replies.
Top