Hi,
I had a look at a job this morning where the client has asked for a internal render finish to barn refurb.
The room is going to be used as a production area hence why they want render not plaster due to damp environment.
I will post pictures but as you can see they have many varying backgrounds (mostly painted)
and due to electricians putting boxes and conduit onto surface there may need a great thickness of material in places as two of the walls are 13m x4m high.
My concern is putting that much material on those substrates wont work. Any one got any ideas on this?
Thanks
I had a look at a job this morning where the client has asked for a internal render finish to barn refurb.
The room is going to be used as a production area hence why they want render not plaster due to damp environment.
I will post pictures but as you can see they have many varying backgrounds (mostly painted)
and due to electricians putting boxes and conduit onto surface there may need a great thickness of material in places as two of the walls are 13m x4m high.
My concern is putting that much material on those substrates wont work. Any one got any ideas on this?
Thanks