thought it could be done by one guy (although id need a labourer- as just begining with the plastering) just wasn't sure i had the right order of how to do a rolling gauge.
can someone tell me where a step by step guide for the rolling gauge is, thank you.
plus do you need a labourer or will you have enough time to clean bucket and tools.
so with the skim tape method, is it 2 coats, then dry and wet coat then remove tape then do the other side?
plus would you sponge the joint (or even the whole ceiling before trowelling)?
could be worse i turned up on a job about 6 years back to paint the kitchen and do a splashback
and their was a fella their tiling it already.
Apparently they had lost my number, from then on i always had terms sign to cover my back.