Tha
That was always my first concern that i needed a way of doing it by which the wall could breathe whilst minimising condensation.If id just straight rendered it,i think it would effectively be no different to how it was originally.I was attempting to create a cavity,small though it would...
Sbr/cement slurry,scratch laid up well before sbr had set,labourer in front painting it on.
Scratch coat 4-1 sand/cement with free flow.Sand was 50/50 washed plastering and sharp silver.
Belcast/stop bead installed at dpc to prevent bridging(render was bridging before)
5-1 top coat again with...
Instead having a dig why dont you answer the op question?
Not the same at all is it.
1 the wall will be insulated
2 there will be a vapour barrier
3 the internal plaster will no longer be bridging the dpc.
4 the badly fitted bay window by others will in a more suitable state to actually work(i.e...
Having read all the input (thank you)im going to take down the coving and i know a local moulding firm that will reinstate.Going to batten out the walls,20mm celotex between(keep an air gap between the back of it and the wall)vapour barrier and then board out with moisture resistant board and...
There was bullshit boarding up to picture rail height(it was flush to this)
When they bought the house they hadnt noticed this.
Previous owner had chased old plaster to take battens and then boarded with what looks like fire check board(asbestos survey carried out and none detected)
We now have...
Evening all.
Just stripped and re-rendered external walls on a brick built house with no cavity as it had become porous and was bridging the dpc.
My question is,what would be the best system for the internal walls?Ive stripped out the boarding that was hiding the damage inside and the walls are...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.