My question is can you please tell me what ratio of mix I should use for SBR when rendering concrete blockwork and also some areas where existing scratch coat is present?
BAL's date sheet has lead me to the following:
Slurry coat 1:1 cement and SBR let down with water up to 1:1:1 and brushed on.
· Whilst slurry coat is still tacky apply scratch coat (4:1) ,mixed with water/SBR mix (5litres of SBR, but this seems to much to me?). Allow this to dry.
· Render coat; (5:1), mixed with water/SBR mix (5litres of SBR?) Then wet dash on this.
The amount of SBR seems excessive, can you guys tell me what your doing?
My question is can you please tell me what ratio of mix I should use for SBR when rendering concrete blockwork and also some areas where existing scratch coat is present?
BAL's date sheet has lead me to the following:
Slurry coat 1:1 cement and SBR let down with water up to 1:1:1 and brushed on.
· Whilst slurry coat is still tacky apply scratch coat (4:1) ,mixed with water/SBR mix (5litres of SBR, but this seems to much to me?). Allow this to dry.
· Render coat; (5:1), mixed with water/SBR mix (5litres of SBR?) Then wet dash on this.
The amount of SBR seems excessive, can you guys tell me what your doing?