Hi all... This is my first post but been here for a while.
Anyway, we do a lot of traditional rendering, dry/wet dash etc, however are getting asked more for mono, mainly krend being specified. We have done a couple of jobs by hand and have a 200m2 job coming up and I’m toying with the idea of buying a pump, however at 5/6k+ for a ritmo and only one larger job currently in the pipeline I need to be sure it will make me the savings in time/labour etc to justify such a big outlay....thinking is the more work we get through we can advertise (don’t advertise at all at present)
Thoughts on whether the outlay is justified please?
Anyway, we do a lot of traditional rendering, dry/wet dash etc, however are getting asked more for mono, mainly krend being specified. We have done a couple of jobs by hand and have a 200m2 job coming up and I’m toying with the idea of buying a pump, however at 5/6k+ for a ritmo and only one larger job currently in the pipeline I need to be sure it will make me the savings in time/labour etc to justify such a big outlay....thinking is the more work we get through we can advertise (don’t advertise at all at present)
Thoughts on whether the outlay is justified please?