spunky
Private Member
Were laying plastic membrane before insulation goes down inc an upstand then screed, we've been asked to attatch the membrane to membrane that protrudes 300mm from the block around all edges of the room
Ensuring a good overlap and using tape to secure it
Had anyone done it like this its a fookin mare the membrane that's already down is filthy dusty etc and everything has to be perfectly flat which doesn't happen
Ensuring a good overlap and using tape to secure it
Had anyone done it like this its a fookin mare the membrane that's already down is filthy dusty etc and everything has to be perfectly flat which doesn't happen