Hi,
I am after some advise from the guys who use Ritmos please.
I have a G4 3 phase and have been doing site and domestic work for some time but my work now is mainly small developments, The sites always seem to be tight and hard to get the machine about so was wondering if anyone has changed from 3 phase to 110 or 240 and how they are getting on?
The G4 is so reliable but was just wondering if the small plug in electrics would do the work i am doing without having to lug heavy gene and machine about so much.
Especially when staff let you down!
Thanks.
I am after some advise from the guys who use Ritmos please.
I have a G4 3 phase and have been doing site and domestic work for some time but my work now is mainly small developments, The sites always seem to be tight and hard to get the machine about so was wondering if anyone has changed from 3 phase to 110 or 240 and how they are getting on?
The G4 is so reliable but was just wondering if the small plug in electrics would do the work i am doing without having to lug heavy gene and machine about so much.
Especially when staff let you down!
Thanks.