hi lads,
im doing a job here in brighton, hacked off defective render, brickwork is in good condition, gave it a coat of rend-aid.
I want to double check on ratios.
is 4-1 washed sand, cement, then 5-1 washed sand, cement, then 1 lime, making it 6-1, with a little water-proofer in top coat, the way to go?
don't want any cracking issues. not a big job, but don't want any come backs from it.
going to have to do it myself, as cant get a spread here.