Hi all I am just in the process of doing my kitchen and I would like some advice. I have an artex ceiling at present and after reading the forum it seems there are differing views on how to go over the artex.
1) Overboard and skim
2) Go over with bonding mix then skim
3) Just PVA then 2 coats of multi finish
I was just wondering if I went for option 2 do I need to PVA the ceiling first before I bond or is this not required for bonding mix?
Also I can see joints coming through the artex where the joists must be do I need to put scrim tape over these first?
Thanks
1) Overboard and skim
2) Go over with bonding mix then skim
3) Just PVA then 2 coats of multi finish
I was just wondering if I went for option 2 do I need to PVA the ceiling first before I bond or is this not required for bonding mix?
Also I can see joints coming through the artex where the joists must be do I need to put scrim tape over these first?