I'm fitting some plasterboards to a SIP kit garden office. I've built an internal stud wall and have installed resilient bars to the studs ready for the boards. I have 2 questions that I haven't been able to find answers by googling.
* Should I install the ceiling plasterboards first, then wall, or the other way around?
* When measuring the boards to cut to size should aim for a flush join in the corners? or some overlap? (i.e the wall boards overlap the ceiling boards)
Thanks,
Ben
I'm fitting some plasterboards to a SIP kit garden office. I've built an internal stud wall and have installed resilient bars to the studs ready for the boards. I have 2 questions that I haven't been able to find answers by googling.
* Should I install the ceiling plasterboards first, then wall, or the other way around?
* When measuring the boards to cut to size should aim for a flush join in the corners? or some overlap? (i.e the wall boards overlap the ceiling boards)