Dry-liners required for:
- metal partinioning of 45 lm of internal walls, height of wall about 2.5m
- dry-lyining 200m2 of walls and 135m2 of ceiling
These ones are 2 newly built flats at the top (2nd) floor.
The material will be provided by the client.
Please reply only if you have the right experience, if you are tidy and organised.
The building is in Staines TW18 2BD
Starting end July.
Many thanks for looking
- metal partinioning of 45 lm of internal walls, height of wall about 2.5m
- dry-lyining 200m2 of walls and 135m2 of ceiling
These ones are 2 newly built flats at the top (2nd) floor.
The material will be provided by the client.
Please reply only if you have the right experience, if you are tidy and organised.
The building is in Staines TW18 2BD
Starting end July.